MPS completed parapet repairs to an 11-story condominium in Washington, DC. MPS was originally contracted to work with architect Davidson and Associates to complete Pilot Phase repairs at one swing stage drop; however, during the Pilot Phase, significant stability issues were discovered with the brick parapets. MPS worked with the architects to install overhead protection to address the unsafe condition while developing a repair detail that would address the unstable parapets. Over the last two years MPS has worked with the condominium association and the architects to completely rebuild all the brick parapets. MPS’s skilled Craftsmen and high-level fabrication capabilities allowed for a quick response to the hidden conditions at the parapet. The parapets are now ready for the condominium to install the new roof they have been planning for over the last several years.